Agri & field · Lone Worker Check-in

Back by four? Making lone-worker check-ins someone actually follows up

Most field crews already check in when they work alone. The gap is usually a vague next check-in time and nobody owning the follow-up. Here's what to log, who should watch for it, and what to do when a check-in is missed.

It's just after one on a Tuesday afternoon. One of your team has taken the ute out to the back blocks to check troughs and fix a fence line on the far boundary. It's a forty-minute drive on farm tracks, the phone drops to one bar past the second gate, and nobody else is working that end of the property today. Before leaving the yard they said, "I'll check in when I get back to the shed, probably around four."

At five, someone notices the ute isn't back. Was four a promise or a guess? Did anyone write it down? Is anyone actually meant to be watching the clock?

This post is about one habit: making a lone-worker check-in something a named person follows up, not just a box that gets ticked when everyone's already safely home.

Why the check-in usually isn't the problem

Most farms, orchards and field crews already have some kind of check-in. A text to the boss, a call on the radio, a word at smoko. The trouble is rarely that people won't check in. It's what happens around the check-in:

None of that is anyone being careless. It's just what happens when the system lives in people's heads. The fix is mostly about writing down three things: where, how they are, and when you'll next hear from them.

What goes on the check-in

Our Lone Worker Check-in template is short on purpose, because nobody wants to fill out a long form on a phone in a paddock. Here's how each field earns its place.

Date and Check-in time. When this check-in happened.

Worker name. Who's out there.

Location / job site. Use the names your crew actually uses: "Top paddock by the dam", "Block 7 rows 20 to 40", "Far boundary fence, north end". If your property has gate numbers or block names on a map in the office, use those. The more specific this is, the shorter any search would be.

Welfare status. Three options: OK — continuing work, Need assistance, or Ending work for the day. That last one matters more than it looks. It's the check-in that closes the day and tells whoever's watching they can stop watching.

Next planned check-in. This is the field that turns a check-in into a plan. Put an actual time in it. If the next check-in is when they get back to the shed, estimate when that will be, and be a little generous with it.

Emergency contact on file. Who should be called if something's wrong. Worth confirming every so often, because phone numbers and next-of-kin change.

Notes / hazards on site. Anything worth knowing: "Creek crossing is up after the rain", "Bull in the next paddock", "No signal past the woolshed, will check in from the ridge". That last kind of note is gold if someone has to come looking.

Worker signature. Signed with a finger on the screen, so the record is clearly theirs.

The follow-up is the part that keeps people safe

A check-in form is a record. It isn't an alarm. What makes the system work is a person who knows they're responsible for noticing when a next check-in time comes and goes without a new entry.

That person might be the farm manager, whoever's in the office, or the crew leader on another block. Whoever it is, agree it out loud and write it into your lone-working procedure. Then agree what happens when a check-in is missed. A simple ladder works for a lot of teams:

The exact times are yours to set based on the work, the terrain and how far away people are. The important bit is that it's decided before the bad day, not worked out on it.

Making it work where the signal is patchy

Field work and good phone coverage don't always go together. A few things help:

When someone selects "Need assistance"

The form lets someone flag that they need help, but a form submission alone shouldn't be the only way they ask for it. If someone's hurt or in trouble, the first move is still a phone call or radio call. The check-in is what tells everyone where they were and what they said at the time, and it gives you a clear record of what happened afterwards.

It's worth agreeing that whoever is watching the check-ins treats a Need assistance entry as a reason to call the worker straight away, every time.

What the record shows you over a few weeks

Every check-in lands in Reports, so a manager can see who was out alone, where, and how often check-ins were on time. Patterns turn up quickly. Maybe one block always runs late because the track's worse than anyone thought. Maybe one person's next check-in times are always optimistic. Maybe nobody ever logs the end of day, which means nobody really knows when the watch can stop.

And if a client, an auditor or your own management asks how you look after people working on their own, you can export the check-ins from Reports as PDF or CSV and show the times, places and sign-offs.

You'll find related templates on the Agri & field page, including the Farm / Agri Hazard Report for logging the creek crossing or fallen fence that someone noticed on the way out.

If you'd like to try it, start a free trial, load the Lone Worker Check-in from Templates in the builder, and stick a fill link in the ute for a week. See how many of your "back by four"s turn into actual times.

← Back to the blog

Start a free trial

Admin seats start with a free trial. Sign up or sign in, open Templates in the builder, load a template, and share a fill link with your crew.