Manufacturing · Machine Pre-start / LOTO Checklist

Clearing a jam: stopped isn't the same as locked out

A jammed machine that has stopped isn't the same as a machine that's safe to reach into. Here's how to walk through lockout for an everyday jam, what the try-start step proves, and how to record it on a phone at the machine.

It's twenty minutes before the end of the shift and the case erector on line two has jammed again. A flap has caught, a carton is folded halfway into the guide rails, and the conveyor behind it is filling up. The carton is right there, an arm's length inside the guard, and the machine has stopped. It would take ten seconds to reach in and pull it out.

That ten-second reach is what this post is about. A stopped machine and a safe machine aren't the same thing, and the gap between them is where lockout earns its keep. Below is how we'd think about lockout for the everyday job of clearing a jam, what each step on our Machine Pre-start / LOTO Checklist is really asking, and how to keep the whole thing quick enough that people don't feel tempted to skip it.

"It's stopped" isn't the same as "it's safe"

When a machine faults on a jam, it usually stops because a sensor told it to. That sensor can clear. Someone else can hit reset, or a photo-eye blocked by the carton can see daylight the moment it moves, and some machines pick up exactly where they left off.

And even with the power genuinely off, plenty of machines keep energy in reserve:

The jam itself is often what's holding that energy back. Pull the carton and you release it, with your hand in the way.

Walking through the lockout steps

The template's tick list is labelled LOTO isolations applied. It has five items. Here's what each one means when the job is a jam rather than a planned rebuild.

Energy sources identified. Before anyone touches a lock, name every source the machine has: the main electrical isolator, the air supply, any hydraulics, gravity, anything under tension. A case erector might have a main isolator and an air dump valve. If the operator isn't sure, that's the moment to get the shift lead or maintenance, not to guess.

Locks / tags applied. Each person working inside the guarding puts their own lock on each isolation point. One lock for the whole crew means someone can finish, remove it and restart the machine while a colleague is still inside.

Stored energy released. Bleed the air, lower or block anything raised, and let anything moving come to a full stop. This is the step people forget most often on jams, because the machine looks still. If the pressure gauge on the air line still shows pressure, it isn't done.

Try-start confirmed zero energy. With locks on and everyone clear, press start. Nothing should happen. Then return the control to off. This is the step that catches the wrong isolator: the panel labelled "line 2" that actually feeds line 3, or the second supply nobody knew about. It takes a few seconds and it's the only step that actually proves the isolation works.

Affected people notified. The operator upstream, the person at the end of the line and the shift lead should all know the machine is locked out and who's inside.

Only then does anyone reach in for the carton.

The pre-start half matters too

The same form has a second tick list, Pre-start checks (tick if OK), which covers the handover back to production:

Then comes the question that decides it: Safe to operate / work? The answer is either Yes or No — do not proceed. If the jam turned out to be caused by a worn guide rail or a sticking cylinder, the honest answer is no, and the machine stays locked until maintenance has looked at it.

Making it quick enough to happen at 2:40 p.m.

Nobody skips lockout because they think it doesn't matter. They skip it because the line is backing up and the isolator is around the back of the machine. A few things make the right way the easy way:

Filling it on a phone at the machine

The form asks for the Date and Time, the Machine / asset ID (whatever's on the plate, like "CE-02" or "Palletiser 1"), and the Operator name. Then come the two tick lists and the Safe to operate question. The Notes / defects box is for anything useful later, like "carton flap caught on left guide rail again, third time this week" or "air dump valve slow to bleed".

It finishes with two signatures, an Operator signature and a Supervisor signature, both signed with a finger on the screen. The supervisor signature means a second person has seen the machine before it goes back into production. The required fields mean the form can't be sent with the lockout steps left blank. People who only fill the form don't need an account; they just need the link.

If you'd like a photo of the jam point or a worn part, add a photo field to the template in the builder before you share the link.

What the records tell you afterwards

Every submission lands in Reports. The obvious use is evidence: when a client, auditor or your own management asks how isolation is controlled, you can export the records as PDF or CSV and show which machine was locked out, when, by whom and what they found.

The less obvious use is spotting repeat jams. If line two's case erector shows up in the LOTO records four times a week with "flap caught on left guide rail" in the notes, that isn't an operator problem. It's an adjustment, a worn part or a carton supply issue, and fixing it removes the reach-in risk altogether.

You'll find related templates on the Manufacturing page, including the Quality Non-Conformance form for when a jam turns out to be a carton or component problem, and the Near Miss Report for the time someone nearly did reach in.

If you'd like to try it, start a free trial, load the Machine Pre-start / LOTO Checklist from Templates in the builder, and put a fill link on the machine that jams most often. Give it a couple of weeks and see what the notes tell you.

← Back to the blog

Start a free trial

Admin seats start with a free trial. Sign up or sign in, open Templates in the builder, load a template, and share a fill link with your crew.